We started by riding about 80mi of the BRP.
It was a little cool but not bad.
The wind was really whipping across the mountain tops though and beat us around a bit @ times.
After a stop @ Mabry Mill,

We rode US 58 from Meadows of Dan, VA to SR 8 and Jacks Creek Covered Bridge.




From there it's only about two miles to Bob White covered bridge.




Bob White is the more interesting of the two.
It's almost twice as long as Jacks Creek Bridge and the woodwork is more intricate.
Next we need to set a date to check out VA's six other covered bridges.