Well ,no, I don t like being stuck somewhere in the middle of it. so Belle is getting its summer ready.
new bearing front and back, double rows ,pumpkin o rings,clean, inspect and reoil-grease u-joint, shaft, cup and splines. new o rings intake manifolds,valve adjustment, spark plug inspection (8 s),
bleed and clean hydrolics .
oil-filter change. probably a new front me880 (the last one made in Brazil was not too efficient)
the air filter was done in november .
the rear Michelin 65 is good for annother year ,three so far.
forgot the oiling of cables
since we didn t get an I/S, I got a shark radio to install .d like to get a bazooka too.
As usual I ll be finnished a few minutes before we leave for LaCrosse

Would like to sync the carbs but I had troubles locating that eqipment

anyhow going to see the USA-Italy rugby game tonight so there s always Manyana
So long
Fred