Inzane 17

Darrell Gwynn foundation update (mini bus)

Started by musclehead, Tue 12, Feb 2013, 17:54:48

Previous topic - Next topic

musclehead

it's got to be 'close' to done by next friday, I even heard the boss today say 'close' I think reality is sinking in. it must be in Daytona for the presentation next -gulp- friday.

the seats are done


door panels are mostly done, need latch locations.


side note, this is great glue, stays pressurized and hardly ever needs cleaning. great for a multi tech shop where no one is responcibile for it.


a donated $4,000 radio is going in this box, mounts under the dash. I sewed this one it has a tops stitch line across the bottom you can't see in this pic.


the dash is 80% done tonite, better pic tomorrow. top stitched this one too  :cooldude:




'in the tunnels uptown, the Rats own dream guns him down. the shots echo down them hallways in the night' - the Boss

musclehead

unbelievably the bus is in paint still! they are supposedly working on it until midnight tonight and have it clear coated and out of paint by noon tomorrow.  then we can start working on the rest of the interior, flooring, more door panels, ceiling panels, window treatments. .............. all to be designed and done by next friday  :-X

we got our work cut out for us.
'in the tunnels uptown, the Rats own dream guns him down. the shots echo down them hallways in the night' - the Boss

musclehead

***** CORRECTION*****  a $1700 RADIO, the entire sounds system is $4G's. I should check myself a lil closer.
'in the tunnels uptown, the Rats own dream guns him down. the shots echo down them hallways in the night' - the Boss